The project consisted of 2 existing buildings (Building 1, first floor only, and Building 5, ground and first floor).
The works were the strip out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions, and dry-lining, carpentry, raised access flooring, floor finishes and decorations.
The tender process was a single-stage tender with design development being undertaken by our client prior to contract award.
Provided Design Management support consisting including appointment of consultants and agreement of scope and fees; management of the design team; development of the Information Required Schedule (IRS); development of the Design Responsibilities Matrix (DRM); chair and document Design Team Meetings and sub-contractor workshops; liaised with the client in the review of design information and material samples; samples schedule ensuring approval in line with the programme; review of building techniques and proposed alternatives to the project team and design team; assisted with risk tracking and management throughout the bid process; ensured that an appropriate set of clarifications were identified as necessary and submitted with the proposal and assisted with the management of the change control log.
Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor. The scope included alterations and service diversions, drainage works and associated surfacing and external works.
The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.
The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions