Case Study

Hatfield Comet

New build construction of 308 student studios adjacent the University of Hertfordshire and renovation of an Art Deco landmark, converted into a boutique hotel and restaurant.

Initial cost plan input and then subsequently engaged to provide project quantity surveying services for procurement and cost management.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.

Book A Free Discovery Call

30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions