Case Study

Strodes Lane

The construction of 111 studio and cluster bedroom student accommodation including 2 commercial spaces on the ground floor and the demolition of the two existing buildings.

Review of electrical subcontract order and a report produced outlining any onerous terms or elements of the order that were considered a risk. The report also included recommendations for subsequent negotiation with the main contractor.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

Commercial review and ongoing support including review sessions, Estimating and Quantity Surveying