Case Study

Operation & Maintenance (O&M) Manuals

Document support services for 70+ projects.

Collation and issue of Operation and Maintenance Manuals provided on an ‘as required’ basis when their in-house capacity is exceeded. This included a review of their previous submissions and creation of a standard template for use when other such templates are not provided by their own Clients. The service also includes responding promptly to any queries received on issued documents and liaising with relevant parties.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.

Book A Free Discovery Call

30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions