Case Study

Morrisons, Gibraltar

Extensive refurbishment of existing store including fit-out, services, roof and external works.

Commercial consulting/management to oversee and manage the bid process and coordination of the preconstruction team including the challenges of working in an overseas territory with logistical, employment and tax considerations.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

Commercial review and ongoing support including review sessions, Estimating and Quantity Surveying

Book A Free Discovery Call

30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions