Design and construction of new 75-place special educational needs school for pupils aged 11-19 years with Autistic Spectrum Conditions and/or Social Communication Interaction Difficulties.
The new school provides a blend of therapeutic supportive rooms alongside general classroom spaces designed to support the academic, social, and emotional progress of the students. The single storey building includes sensory rooms, air-conditioned calm rooms attached to each classroom and low noise building services. The external landscaping includes sport and habitat areas as well as fenced de-escalation zones.
Provided Design Management support consisting including management of the design team; development of the Information Required Schedule (IRS) and Integrated Design Management Programme; design support and advice to Commercial Surveyors and Buyers on technical issues in particular the procurement of sub-contractor packages; assisted with scoping of sub-contractor packages chaired and documented Design Team Meetings and sub-contractor workshops; created and managed the project planning conditions tracker, assisted with the management of planning condition discharge; liaised with the client in the review of design information and material samples; samples schedule ensuring approval in line with the programme; review of building techniques and proposed alternatives to the project team and design team: management of common data environment information, utilizing the workflows and commenting tool, closing out key actions and assisted in the management of final issue drawings for the O&M Manual.
Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor. The scope included alterations and service diversions, drainage works and associated surfacing and external works.
The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.
Commercial review and ongoing support including review sessions, Estimating and Quantity Surveying
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions