Case Study

Pentre Awel – Life Science & Well Being Village

Construction of five distinct buildings comprising wet sports, dry sports, and health facilities, forming a comprehensive health and wellbeing hub for the Welsh community.

The development includes a 25-metre swimming pool, eight sports courts, multi-purpose studios, education and research spaces, together with dedicated business development areas.

Post-contract quantity surveying support for the roofing and cladding contractor, including interim valuations, change control, cost/value reporting, contractual notices, subcontract orders and administration, and final account.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.

Book A Free Discovery Call

30 Minute free discovery call where we can discuss your requirements. We can go through any specific needs and explore solutions