Case Study

Lydstep Flats

Refurbishment works to 3 identical high-rise towers including over-cladding of existing external walls, replacement windows and doors, roof repairs and replacement, replacement rainwater pipes, balcony repairs and replacement balustrades. Minor structural repairs and some internal works were also part of the project. The project was procured through the SEWSCAP framework by Cardiff Council.

Support of Stage 1 bid submission with Bid Management and Commercial Consulting. Following the success of the Stage 1 bid, further appointed to support the Stage 2 Bid team with Preconstruction Management services.

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.