Case Study

Hollis Building

Hollis Building is a 120-bed purpose-built student accommodation building set over 5 floors. The development includes student apartments, with a mix of cluster flats and studios, and features such as a laundry room, accessible flats, various communal spaces including cinema area, a roof terrace and associated external works. Designed and delivered to BREEAM Excellent, sustainable features included photovoltaic panels, electric heating, a living wall, green roofs, and bird and bat boxes.

Design Management of the RED appointed Design Team and CDP Sub-contractors 

  • Management of Design Team 
  • Management of IRS tracking and updating 
  • Chairing Design Team Meetings, recording and issuing minutes 
  • Management of Aconex CDE 
  • Review of building techniques 
  • Management of Building Control Tracker 
  • Management of Planning Conditions Tracker 
  • Monthly reporting for internal and client meetings 
  • Assist with management of close-out tracker for handover including Final Construction Issue Information

Other Projects

Enabling works that were part of a wider scope being undertaken at The British Museum to the South West Energy Centre (SWEC) by a Main Contractor.  The scope included alterations and service diversions, drainage works and associated surfacing and external works.

The excavation of a single-storey extension to the existing basement library to form new library study and storage spaces, including the demolition of the existing rear library extension and erection of the replacement two-storey extension with external staircase, roof terrace and alterations to the West range to incorporate a new lift shaft at the Hertford Library.

The project consists of the fit-out and refurbishment of Ground Floor to Level 11 of the HMRC Cardiff Hub from the existing “Category A” Developer’s finish to “Category B” fit-out ready for occupation by the Employer. The scope consists of the strip-out of existing fit-out works, reconfiguring layout and new CAT A fit-out including M&E, ceilings, partitions and dry-lining, carpentry, raised access flooring, decorations, audio-visual installations etc.